Allied-telesis 8100S Series Manual do Utilizador Página 96

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 95
Chapter 6: Powering On and Verifying the Stack
96
Figure 40. Switch Initialization Messages (Continued)
At this point, the stack is operational and ready to forward network traffic.
Before connecting the network cables, go to “Verifying the Installation” on
page 101.
Note
After the stack becomes operational, the stack ID LEDs on the
master and member switches flash the ID numbers and code letter
“H” every few seconds. This is normal for the LEDs when the
switches are operating in a stack configuration.
Stack topology discovery is in process... Please Wait
Loading configuration file “boot.cfg” .... done!
Sending Configuration file to all slaves. Please wait...
00000001
Sending configuration file done!
Press <ENTER> key to connect...
New Switch 2 (00:15:77:99:99:91) is added into stack
Vista de página 95
1 2 ... 91 92 93 94 95 96 97 98 99 100 101 ... 139 140

Comentários a estes Manuais

Sem comentários