
AT-FS708/POE Fast Ethernet Switch Installation Guide
45
3. Power on the end nodes.
Powering on the
Switch
To power on the AT-FS708/POE Fast Ethernet switch, perform the
following procedure:
1. Plug the power cord into the AC power connector on the back panel of
the switch, as shown in Figure 14.
Power cord is used as a disconnection device. To de-energize
equipment, disconnect the power cord. E3
Figure 14. Connecting the AC Power Cord
2. Plug the other end or the power cord into a wall outlet.
3. Verify that the PWR LED is green.
If the PWR LED is OFF, refer to Chapter 3, “Troubleshooting” on page
47.
The switch is ready for network operations.
Comentários a estes Manuais