Allied-telesis AT-9448Ts/XP (Basic Layer 3) Manual do Utilizador Página 33

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 32
33
Chapter 2
Installing the Hardware
This chapter contains an overview of the installation procedures for a stack
and the procedures for installing the hardware. The chapter contains the
following sections:
“Installation Overview” on page 34
“Reviewing the Safety Precautions” on page 36
“Planning the Installation of a Stack” on page 38
“Maximum Number of Switches in a Stack” on page 39
“Unpacking a Switch” on page 40
“Installing the AT-StackXG Stacking Module” on page 41
“Installing the Power Cord Retaining Clip (AC Switches Only)” on
page 44
“Disconnecting the Network Cables” on page 45
“Installing the Switches in an Equipment Rack” on page 46
“Labeling the Switches” on page 48
Vista de página 32
1 2 ... 28 29 30 31 32 33 34 35 36 37 38 ... 107 108

Comentários a estes Manuais

Sem comentários