Allied-telesis x310 Series Manual do Utilizador Página 89

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 88
89
Chapter 7
Powering On the Stack
This chapter contains the following procedures:
“Installing the Power Cord Retaining Clip” on page 90
“Powering On the Switches Individually” on page 91
“Powering On the Switches Simultaneously” on page 94
“Verifying the Stack” on page 96
“Monitoring the Initialization Processes” on page 99
Perform “Powering On the Switches Individually” on page 91 if you want to
control the assignment of the ID numbers to the switches of the stack. The
numbers are assigned in the order in which you power on the units.
Otherwise, perform “Powering On the Switches Simultaneously” on
page 94 to have the switches assign the numbers automatically. After the
ID numbers are assigned, you may change them with the STACK
RENUMBER command, described in the Software Reference for x310
Series Switches, AlliedWare Plus Operating System.
Caution
You should not change the ID numbers of the switches after you
begin to configure the parameter settings. Otherwise, the stack
might assign configuration settings to the wrong units.
Vista de página 88
1 2 ... 84 85 86 87 88 89 90 91 92 93 94 ... 119 120

Comentários a estes Manuais

Sem comentários