Chapter 6: Installing the Transceivers and Cabling the Ports
118
Figure 73. Handle on SFP+ Transceiver
3. Slide the transceiver into the slot until it clicks into place, as shown in
Figure 74.
Figure 74. Installing an SFP+ Transceiver in the AT-SBx81XS6 Line Card
Note
If you are ready to attach the fiber optic cable to the transceiver,
continue with the next step. Otherwise, repeat steps 1 to 3 to install
the remaining SFP transceivers in the line cards.
Handle