Allied-telesis AT-MCF2000M Manual do Utilizador Página 44

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 43
Chapter 2: Installation
44
Unpacking the AT-MCF2000M Management Module
To unpack the module, perform the following procedure:
1. Remove all components from the shipping package.
Note
Store the packaging material in a safe location. You
must use the original shipping material if you need to
return the unit to Allied Telesis.
2. Verify that the following items are included in the
shipping package. If an item is missing or damaged,
contact your Allied Telesis sales representative for
assistance.
One AT-MCF2000M Management Module
One RS-232 Serial Management Cable with DIN-8
and DB-9 connectors for local management
This installation guide
Vista de página 43
1 2 ... 39 40 41 42 43 44 45 46 47 48 49 ... 69 70

Comentários a estes Manuais

Sem comentários