Allied-telesis AT-MCF2000M Manual do Utilizador Página 55

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 54
AT-MCF2000M Management Module Installation Guide
55
Verifying the Installation
This procedure verifies the installation of the
AT-MCF2000M Management Module. The procedure
assumes the chassis with the module is powered on.
To verify the installation of the module, perform the
following procedure:
1. Verify that the Power LED on the module is green.
2. If you connected a network cable to the 10/100/
1000Base-T Management Module, verify that the L/A
(Link/Activity) LED is green or amber.
3. If you connected a cable to the Stack port, the Link/
Activity LED for the port should be steady or flashing
green.
Note
If there are any problems, refer to Chapter 3,
“Troubleshooting” on page 63 for assistance.
Vista de página 54
1 2 ... 50 51 52 53 54 55 56 57 58 59 60 ... 69 70

Comentários a estes Manuais

Sem comentários