Allied-telesis AT-SBx81CFC960 Manual do Utilizador

Consulte online ou descarregue Manual do Utilizador para Hardware de computador Allied-telesis AT-SBx81CFC960. Allied Telesis AT-SBx81CFC960 User Manual [en] Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir

Resumo do Conteúdo

Página 1 - Installation Guide

613-001935 Rev. BSwitchBlade x8106Layer 3+ Chassis SwitchAT-SBx81CFC960Controller Fabric Card AT-SBx8106 Chassis AT-SBx81GT24 Ethernet Line Card AT

Página 2

List of Figures10Figure 50: Verifying the AT-SBxPWRSYS1 Power Supply...

Página 3 - Industry Canada

Chapter 5: Installing the Chassis in an Equipment Rack100 Section II: Installing the ChassisInstalling the Chassis in the Equipment RackThe procedure

Página 4 - Translated Safety Statements

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 1012. Lift the AT-SBx8106 Chassis into t

Página 5 - Contents

Chapter 5: Installing the Chassis in an Equipment Rack102 Section II: Installing the ChassisFigure 39. Installing the Rack Mount Screws5. Tighten all

Página 6

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 103Figure 40. Tightening the Rack Mount

Página 7

Chapter 5: Installing the Chassis in an Equipment Rack104 Section II: Installing the ChassisRemoving the Shipping BraceNow that the chassis is install

Página 8

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 105Installing the Chassis Grounding Wire

Página 9

Chapter 5: Installing the Chassis in an Equipment Rack106 Section II: Installing the Chassis3. Insert one end of the grounding wire into the grounding

Página 10

107Chapter 6Installing the Power SuppliesThis chapter explains how to install the power supplies. It has the following sections: “Protecting Against

Página 11

Chapter 6: Installing the Power Supplies108 Section II: Installing the ChassisProtecting Against Electrostatic Discharge (ESD)To protect the equipment

Página 12

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 109Installing the AT-SBxPWRSYS1 AC Syste

Página 13

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation Guide11Figure 110: Removing the Dust Cover from an SFP+ Transceiver in the AT-SB

Página 14 - List of Tables

Chapter 6: Installing the Power Supplies110 Section II: Installing the ChassisFigure 48. Removing the Blank Slot Cover from Power Supply Slot C3. Remo

Página 15

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 111Figure 49. Items Included with the AT

Página 16 - ™ feature

Chapter 6: Installing the Power Supplies112 Section II: Installing the Chassis4. Check the power supply for its model name, shown in Figure 50, to ver

Página 17

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 1136. Align and insert the AT-SBxPWRSYS1

Página 18 - Contacting Allied Telesis

Chapter 6: Installing the Power Supplies114 Section II: Installing the Chassis7. Lower the power supply locking handle to secure the power supply to t

Página 19 - Hardware Overview

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 115Installing the AT-SBxPWRPOE1 PoE Powe

Página 20

Chapter 6: Installing the Power Supplies116 Section II: Installing the ChassisFigure 54. Removing the Blank Slot Cover from Power Supply Slot A3. Remo

Página 21 - Chassis and Power Supplies

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 117Figure 55. Items Included with the AT

Página 22 - Introduction

Chapter 6: Installing the Power Supplies118 Section II: Installing the Chassis4. Check the model name, shown in Figure 56, to verify the module.If the

Página 23 - AT-SBxFAN06 Module Cooling

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 119Figure 58. Inserting the AT-SBxPWRPOE

Página 24 - AT-SBx8106 Chassis

List of Figures12Figure 170: Loosening the AT-SBxFAN06 Fan Module from the Backplane Connector... 254F

Página 25

Chapter 6: Installing the Power Supplies120 Section II: Installing the Chassis7. Lower the locking handle of the power supply module to secure the mod

Página 26

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 121Installing the AT-SBxPWRSYS1 DC Syste

Página 27 - Slots for the Power Supplies

Chapter 6: Installing the Power Supplies122 Section II: Installing the ChassisFigure 60. Removing the Blank Slot Cover from Power Supply Slot C3. Remo

Página 28 - AT-SBxPWRSYS1 AC Power Supply

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 123Figure 61. Items Included with the AT

Página 29

Chapter 6: Installing the Power Supplies124 Section II: Installing the ChassisFigure 62. On/Off Switch on the AT-SBxPWRSYS1 DC Power Supply5. With a #

Página 30 - AT-SBxPWRPOE1 Power Supply

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 125Figure 64. Raising Handle on the AT-S

Página 31

Chapter 6: Installing the Power Supplies126 Section II: Installing the Chassis8. Lower the locking handle of the power supply module to secure the mod

Página 32

127Chapter 7Installing the AT-SBx81CFC960 Controller and Ethernet Line CardsThis chapter describes how to install the controller and Ethernet line car

Página 33

Chapter 7: Installing the AT-SBx81CFC960 Controller and Ethernet Line Cards128 Section II: Installing the ChassisGuidelines to Handling the Controller

Página 34 - AT-SBxFAN06 Module

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 129Figure 67. Aligning a Card in a Slot

Página 35

13Table 1. AT-SBxPWRSYS1 Power Supply LEDs ...

Página 36

Chapter 7: Installing the AT-SBx81CFC960 Controller and Ethernet Line Cards130 Section II: Installing the ChassisInstalling the AT-SBx81CFC960 Control

Página 37

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 131Figure 69. Items Included with the AT

Página 38

Chapter 7: Installing the AT-SBx81CFC960 Controller and Ethernet Line Cards132 Section II: Installing the ChassisFigure 71. Removing the Battery Insul

Página 39 - AT-SBx81GT24 Line Card

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 133Figure 73. Aligning the AT-SBx81CFC96

Página 40

Chapter 7: Installing the AT-SBx81CFC960 Controller and Ethernet Line Cards134 Section II: Installing the ChassisFigure 74. Closing the Locking Levers

Página 41 - AT-SBx81GT40 Line Card

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 135Figure 75. Tightening the Thumb Screw

Página 42

Chapter 7: Installing the AT-SBx81CFC960 Controller and Ethernet Line Cards136 Section II: Installing the ChassisInstalling the Ethernet Line CardsThi

Página 43

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 1373. Carefully remove the Ethernet line

Página 44 - AT-SBx81GP24 PoE Line Card

Chapter 7: Installing the AT-SBx81CFC960 Controller and Ethernet Line Cards138 Section II: Installing the Chassis5. Slowly and carefully slide the car

Página 45

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 139Figure 80. Tightening the Thumb Screw

Página 46

List of Tables14

Página 47 - AT-SBx81GS24a SFP Line Card

Chapter 7: Installing the AT-SBx81CFC960 Controller and Ethernet Line Cards140 Section II: Installing the ChassisInstalling the Blank Slot CoversAfter

Página 48

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 141Allied Telesis recommends tightening

Página 49 - AT-SBx81XS6 SFP+ Line Card

Chapter 7: Installing the AT-SBx81CFC960 Controller and Ethernet Line Cards142 Section II: Installing the Chassis

Página 50

143Chapter 8Installing the Transceivers and Cabling the PortsThis chapter describes how to install the fiber optic transceivers and attach the cables

Página 51 - AT-SBx81XS16 SFP+ Line Card

Chapter 8: Installing the Transceivers and Cabling the Ports144 Section II: Installing the ChassisCabling Guidelines for the Twisted Pair Ports on the

Página 52

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 145 The default wiring configuration of

Página 53 - Distance

Chapter 8: Installing the Transceivers and Cabling the Ports146 Section II: Installing the ChassisFigure 84. Connecting Cables to Ports on the AT-SBx8

Página 54 - Requirements

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 147Guidelines to Installing SFP and SFP+

Página 55 - Detection

Chapter 8: Installing the Transceivers and Cabling the Ports148 Section II: Installing the ChassisInstalling SFP Transceivers in the AT-SBx81GS24a Lin

Página 56 - Powered Device

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 1493. To install the transceiver in an S

Página 57

15PrefaceThis guide contains the hardware installation instructions for the Layer 3+ SwitchBlade x8106 Chassis Switch. The preface contains the follow

Página 58

Chapter 8: Installing the Transceivers and Cabling the Ports150 Section II: Installing the ChassisFigure 88. Removing the Dust Cover from the SFP Tran

Página 59 - Chapter 3

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 1517. Connect the fiber optic cable to t

Página 60 - Hardware Components

Chapter 8: Installing the Transceivers and Cabling the Ports152 Section II: Installing the ChassisInstalling SFP+ Transceivers in the AT-SBx81XS6 Line

Página 61

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 153Figure 92. Handle on SFP+ Transceiver

Página 62 - Guidelines

Chapter 8: Installing the Transceivers and Cabling the Ports154 Section II: Installing the ChassisFigure 94. Removing the Dust Cover from an SFP+ Tran

Página 63

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 1556. Connect the fiber optic cable to t

Página 64 - Dual Controller Cards

Chapter 8: Installing the Transceivers and Cabling the Ports156 Section II: Installing the ChassisInstalling AT-SP10TW Cables in the AT-SBx81XS6 Line

Página 65

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 157Figure 98. Release Tab on the AT-SP10

Página 66 - SYS Status LEDs

Chapter 8: Installing the Transceivers and Cabling the Ports158 Section II: Installing the ChassisNoteTo remove the connector and cable from the SFP+

Página 67

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 159Installing SFP+ Transceivers in the A

Página 68

Preface16Structure of the Installation GuideThis guide has the following three sections: Section I: Hardware OverviewThe chapters in this section des

Página 69 - SBx Linecard Status LEDs

Chapter 8: Installing the Transceivers and Cabling the Ports160 Section II: Installing the ChassisFigure 101. Installing a Transceiver in the AT-SBx81

Página 70 - SFP+ Slots

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 161NoteThe dust cover protects the fiber

Página 71

Chapter 8: Installing the Transceivers and Cabling the Ports162 Section II: Installing the ChassisFigure 104. Attaching a Fiber Optic Cable to a Trans

Página 72 - Console (RS-232) Port

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 163Installing AT-SP10TW Cables in the AT

Página 73 - NET MGMT

Chapter 8: Installing the Transceivers and Cabling the Ports164 Section II: Installing the Chassiseven numbered slot, position the connector so that t

Página 74

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 165Cabling the NET MGMT Port on the AT-S

Página 75 - USB Port

Chapter 8: Installing the Transceivers and Cabling the Ports166 Section II: Installing the ChassisAfter cabling the NET MGMT port, do one of the follo

Página 76 - Reset Button

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 167Installing SFP+ Transceivers in the A

Página 77

Chapter 8: Installing the Transceivers and Cabling the Ports168 Section II: Installing the Chassis2. If you are installing the SFP+ transceiver in slo

Página 78

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 169Figure 110. Removing the Dust Cover f

Página 79 - Installing the Chassis

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation Guide17Safety Symbols Used in this DocumentThis document uses the following conv

Página 80

Chapter 8: Installing the Transceivers and Cabling the Ports170 Section II: Installing the ChassisFigure 112. Attaching a Fiber Optic Cable to an SFP+

Página 81 - Safety Precautions and Site

171Chapter 9Powering On the ChassisThis chapter describes how to power on the chassis and monitor the initialization process. The chapter contains the

Página 82 - Reviewing Safety Precautions

Chapter 9: Powering On the Chassis172 Section II: Installing the ChassisVerifying the InstallationPlease perform the following procedure before poweri

Página 83

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 173Powering On the AT-SBxPWRSYS1 AC Syst

Página 84

Chapter 9: Powering On the Chassis174 Section II: Installing the ChassisFigure 114. Connecting the AC Power Cord for the AT-SBxPWRSYS1 AC Power Supply

Página 85

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 175Figure 115. Securing the Power Cord f

Página 86

Chapter 9: Powering On the Chassis176 Section II: Installing the ChassisPowering On the AT-SBxPWRPOE1 Power SupplyIf you have not already installed th

Página 87

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 1773. Use the twist tie that comes with

Página 88

Chapter 9: Powering On the Chassis178 Section II: Installing the ChassisFigure 118. Dress and Secure AC Power Cords6. Go to “Monitoring the Initializa

Página 89 - Chapter 5

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 179Powering On the AT-SBxPWRSYS1 DC Syst

Página 90 - Required Tools and Material

Preface18Contacting Allied TelesisIf you need assistance with this product, you may contact Allied Telesis technical support by going to the Support &

Página 91 - Preparing the Equipment Rack

Chapter 9: Powering On the Chassis180 Section II: Installing the ChassisThe components of the power supply are identified in Figure 119.Figure 119. Co

Página 92 - 342.4 mm (13.5”)

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 181Choosing aMethod forAttaching theGrou

Página 93

Chapter 9: Powering On the Chassis182 Section II: Installing the Chassis3. Use an 8 mm wrench to remove the grounding post nut and washer, shown in Fi

Página 94

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 183Figure 124. Installing the Grounding

Página 95

Chapter 9: Powering On the Chassis184 Section II: Installing the ChassisConnecting theGrounding Wirewith Bare WireTo attach the grounding wire to the

Página 96 - Removing the Rubber Feet

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 1854. Secure the wire with the nut and w

Página 97 - 3. Turn the chassis over

Chapter 9: Powering On the Chassis186 Section II: Installing the ChassisChoosing aMethod forAttaching thePower WiresThe AT-SBxPWRSYS1 DC Power Supply

Página 98

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 187Figure 129. Stripping the Power Wires

Página 99 - “Dim X” “Dim X” “Dim X”

Chapter 9: Powering On the Chassis188 Section II: Installing the ChassisFigure 131. On/Off Switch on the AT-SBxPWRSYS1 DC Power Supply4. Use a #1 Phil

Página 100

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 189Figure 132. Opening the Plastic Cover

Página 101

19Section IHardware OverviewThis section contains the following chapters: Chapter 1, “Chassis and Power Supplies” on page 21 Chapter 2, “Ethernet Li

Página 102

Chapter 9: Powering On the Chassis190 Section II: Installing the ChassisFigure 133. Removing the Terminal Screws6. With a #3 Phillips-head screwdriver

Página 103

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 191Figure 134. Connecting the Positive (

Página 104 - Removing the Shipping Brace

Chapter 9: Powering On the Chassis192 Section II: Installing the ChassisFigure 135. Connecting the Negative (-) Power Wire with a Straight TerminalWar

Página 105

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 193Figure 136. Closing the Plastic Cover

Página 106

Chapter 9: Powering On the Chassis194 Section II: Installing the ChassisFigure 137. Tightening the Handle Locking Screw10. Before attaching the power

Página 107 - Installing the Power Supplies

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 195Connecting theDC Power Wireswith the

Página 108

Chapter 9: Powering On the Chassis196 Section II: Installing the Chassis4. Using a #1 Phillips-head screwdriver, remove the two screws that secure the

Página 109

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 197Figure 141. Removing the Terminal Scr

Página 110

Chapter 9: Powering On the Chassis198 Section II: Installing the ChassisFigure 142. Connecting the Positive (+) Power Wire with a Right Angle Terminal

Página 111

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 199Figure 143. Connecting the Negative (

Página 112

Copyright © 2014 Allied Telesis, Inc. All rights reserved. No part of this publication may be reproduced without prior written permission from Allied

Página 114

Chapter 9: Powering On the Chassis200 Section II: Installing the ChassisFigure 144. Tightening the Handle Locking Screw9. Before attaching the power w

Página 115

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 201Connecting BareDC Power WiresTo attac

Página 116

Chapter 9: Powering On the Chassis202 Section II: Installing the ChassisFigure 146. Connecting the Positive Lead Wire5. Wrap the negative lead wire cl

Página 117

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 203Figure 147. Connecting the Negative L

Página 118

Chapter 9: Powering On the Chassis204 Section II: Installing the Chassis7. With a #2 Phillips-head screwdriver, tighten the handle locking screw to se

Página 119

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 205Monitoring the Initialization Process

Página 120

Chapter 9: Powering On the Chassis206 Section II: Installing the Chassislogin” prompt.Figure 148. Switch Initialization MessagesVerifying release... O

Página 121

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 207Figure 149. Switch Initialization Mes

Página 122

Chapter 9: Powering On the Chassis208 Section II: Installing the Chassis

Página 123

209Chapter 10Verifying the Hardware Operations of the ChassisThis chapter describes how to verify the operations of the chassis. The chapter contains

Página 124

21Chapter 1Chassis and Power SuppliesThis chapter describes the Layer 3+ SwitchBlade x8106 Chassis Switch in the following sections: “Introduction” o

Página 125

Chapter 10: Verifying the Hardware Operations of the Chassis210 Section II: Installing the ChassisUsing the LEDs to Verify the ChassisAfter powering o

Página 126

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 211prevents them from completing the ini

Página 127 - Chapter 7

Chapter 10: Verifying the Hardware Operations of the Chassis212 Section II: Installing the ChassisUsing Local Management to Verify the ChassisThis sec

Página 128

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 2133. Configure the VT-100 terminal or t

Página 129 - INCORRECT

Chapter 10: Verifying the Hardware Operations of the Chassis214 Section II: Installing the Chassis2. Compare the version number displayed by the SHOW

Página 130

215Chapter 11TroubleshootingThis chapter contains information on how to troubleshoot the SwitchBlade x8106 product.NoteIf you are unable to resolve a

Página 131

Chapter 11: Troubleshooting216 Section II: Installing the ChassisAT-SBxPWRSYS1 and AT-SBxPWRPOE1 AC Power SuppliesA power supply is operating normally

Página 132

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 217AT-SBxPWRSYS1 DC Power SupplyIf you s

Página 133

Chapter 11: Troubleshooting218 Section II: Installing the Chassissoftware version on the control card, refer to “Using Local Management to Verify the

Página 134 - Controller Fabric Card

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 219Ethernet Line CardsA quick and easy w

Página 135

Chapter 1: Chassis and Power Supplies22 Section I: Hardware OverviewIntroductionThe SwitchBlade x8106 product is a modular Layer 3+ Ethernet switch. T

Página 136

Chapter 11: Troubleshooting220 Section II: Installing the Chassis Use the SHOW CARD command to display card status information, as shown in Figure 15

Página 137

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 221Twisted Pair PortsThis section applie

Página 138

Chapter 11: Troubleshooting222 Section II: Installing the Chassis The default speed setting of Auto-Negotiation is not appropriate for ports connecte

Página 139

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 223Power Over EthernetThis section appli

Página 140

Chapter 11: Troubleshooting224 Section II: Installing the Chassis Use the SHOW POE CARD command to determine whether the switch has reach its maximum

Página 141

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 225Fiber Optic or Twisted Pair Transceiv

Página 142

Chapter 11: Troubleshooting226 Section II: Installing the ChassisAT-SBx81CFC960 Controller Fabric CardIf the chassis has one controller card and the c

Página 143 - Chapter 8

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 227AT-SBxFAN06 Fan ModuleThe AT-SBxFAN06

Página 144

Chapter 11: Troubleshooting228 Section II: Installing the ChassisLocal (Console) Management SessionIf you are unable to establish a local management s

Página 145 - Connecting

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 229Power Supply Interfaces (Opto-coupler

Página 146

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 23Figure 3 illustrates the fan module.Figure 3

Página 147

Chapter 11: Troubleshooting230 Section II: Installing the Chassis

Página 148

231Chapter 12Replacing ModulesThis chapter contains procedures on how to replace modules in the unit. The chapter contains the following sections: “R

Página 149

Chapter 12: Replacing Modules232 Section II: Installing the ChassisReplacing AT-SBxPWRSYS1 AC and AT-SBxPWRPOE1 Power SuppliesThis section contains th

Página 150

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 2332. Lift the locking hand on the power

Página 151

Chapter 12: Replacing Modules234 Section II: Installing the ChassisFigure 155. Removing the Power Supply from the Chassis4. Do one of the following:

Página 152

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 235Figure 156. Installing a Blank Power

Página 153

Chapter 12: Replacing Modules236 Section II: Installing the ChassisFigure 157. Lowering the Locking Handle on the Power Supply Slot Cover

Página 154

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 237Replacing the AT-SBxPWRSYS1 DC Power

Página 155

Chapter 12: Replacing Modules238 Section II: Installing the ChassisNoteIf the power wires are connected to the terminal block with the right angle ter

Página 156

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 239Figure 160. Removing the Negative Lea

Página 157

Chapter 1: Chassis and Power Supplies24 Section I: Hardware OverviewAT-SBx8106 ChassisThe AT-SBx8106 Chassis is a 4RU unit with slots for four Etherne

Página 158

Chapter 12: Replacing Modules240 Section II: Installing the ChassisFigure 161. Removing the Positive Lead Wire from the Terminal Block7. Reinstall the

Página 159

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 241Figure 162. Reinstalling the Screws o

Página 160

Chapter 12: Replacing Modules242 Section II: Installing the ChassisFigure 163. Closing the Plastic Cover9. Use an 8 mm wrench to remove the grounding

Página 161

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 243Figure 164. Removing the Grounding Wi

Página 162

Chapter 12: Replacing Modules244 Section II: Installing the ChassisFigure 165. Reinstalling the Nut and Washer on the Grounding Post11. Lift the locki

Página 163

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 245Figure 166. Lifting the Locking Handl

Página 164

Chapter 12: Replacing Modules246 Section II: Installing the ChassisFigure 167. Installing a Blank Power Supply Slot Cover14. Lower the locking handle

Página 165

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 247Figure 168. Lowering the Locking Hand

Página 166

Chapter 12: Replacing Modules248 Section II: Installing the ChassisReplacing Ethernet Line CardsThis section contains the procedure for replacing Ethe

Página 167

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 249instructions, refer to “Installing th

Página 168

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 25Figure 5. Rear View of the AT-SBx8106 Chassi

Página 169

Chapter 12: Replacing Modules250 Section II: Installing the ChassisReplacing the AT-SBx81CFC960 Controller Fabric CardThis section contains the proced

Página 170

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 251NoteYou should not replace a controll

Página 171 - Powering On the Chassis

Chapter 12: Replacing Modules252 Section II: Installing the Chassis7. Store the controller card in an anti-static bag.8. Return the card to its shippi

Página 172 - Verifying the Installation

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 253Replacing the AT-SBxFAN06 Fan ModuleT

Página 173

Chapter 12: Replacing Modules254 Section II: Installing the ChassisFigure 169. Loosening the Screw on the AT-SBxFAN06 Fan Module3. Carefully pull on t

Página 174 - Power Supply

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 2554. Slowly pull the module out 25 mm (

Página 175

Chapter 12: Replacing Modules256 Section II: Installing the ChassisFigure 172. Removing the AT-SBxFAN06 Fan Module from the ChassisInstalling a NewAT-

Página 176

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 257Figure 173. Installing a New AT-SBxFA

Página 177

Chapter 12: Replacing Modules258 Section II: Installing the ChassisFigure 174. Securing the AT-SBxFAN06 Fan Module on the Backplane Connector3. With a

Página 178

259Chapter 13Upgrading the Controller Fabric CardThis chapter contains the procedure for upgrading the AT-SBx8106 Chassis from the AT-SBx81CFC400 Cont

Página 179

Chapter 1: Chassis and Power Supplies26 Section I: Hardware OverviewSlots for the Ethernet Line and Controller CardsThe chassis has slots for four Eth

Página 180

Chapter 13: Upgrading the Controller Fabric Card260 Section II: Installing the ChassisBefore You BeginThe instructions in this chapter explain how to

Página 181

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 261Card in the chassis has a feature lic

Página 182

Chapter 13: Upgrading the Controller Fabric Card262 Section II: Installing the ChassisUpgrading the Controller Fabric CardThis section contains step-b

Página 183

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 2637. Power off the chassis.8. Remove th

Página 184 - Grounding Wire

Chapter 13: Upgrading the Controller Fabric Card264 Section II: Installing the Chassiscontroller card. The name can be the same as or different from t

Página 185

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 265refer to the Software Reference for S

Página 186

Chapter 13: Upgrading the Controller Fabric Card266 Section II: Installing the Chassis

Página 187

267Section IIIBuilding a Stack with VCStack PlusThis section contains the following chapters: Chapter 14, “VCStack Plus Overview” on page 269 Chapte

Página 189

269Chapter 14VCStack Plus OverviewThis chapter contains a brief overview of the VCStack Plus feature. For more information, refer to the Software Refe

Página 190

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 27Slots for the Power SuppliesThe chassis has

Página 191

Chapter 14: VCStack Plus Overview270 Section III: Building a Stack with VCStack PlusOverviewThe VCStack Plus feature is an optional feature for the AT

Página 192

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 271Stack Trunk and Stacking

Página 193

Chapter 14: VCStack Plus Overview272 Section III: Building a Stack with VCStack PlusVCStack Plus feature. The stacking transceivers must be connected

Página 194

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 273Cabling Configurations f

Página 195 - Angle Terminals

Chapter 14: VCStack Plus Overview274 Section III: Building a Stack with VCStack PlusTwo ControllerCards PerChassisFigure 177 illustrates the wiring co

Página 196

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 275transceiver in SFP+ slot

Página 197

Chapter 14: VCStack Plus Overview276 Section III: Building a Stack with VCStack PlusVCStack Plus Feature LicenseA key component of the stack is the VC

Página 198

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 277Optional Feature License

Página 199

Chapter 14: VCStack Plus Overview278 Section III: Building a Stack with VCStack PlusChassis ID NumbersThe switches in the stack have to be assigned ID

Página 200

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 279Priority NumbersThe swit

Página 201 - Connecting Bare

Chapter 1: Chassis and Power Supplies28 Section I: Hardware OverviewAT-SBxPWRSYS1 AC Power SupplyThe AT-SBxPWRSYS1 AC Power Supply, shown in Figure 9,

Página 202

Chapter 14: VCStack Plus Overview280 Section III: Building a Stack with VCStack Plusoptional. If you choose not to set the value, the controller cards

Página 203

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 281Stacking GuidelinesHere

Página 204

Chapter 14: VCStack Plus Overview282 Section III: Building a Stack with VCStack Plus

Página 205

283Chapter 15Building a StackThis chapter contains step-by-step instructions on how to configure the switches to build a stack with the VCStack Plus f

Página 206

Chapter 15: Building a Stack284 Section III: Building a Stack with VCStack PlusBefore You BeginPlease review the following information before you begi

Página 207

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 285Displaying the Managemen

Página 208

Chapter 15: Building a Stack286 Section III: Building a Stack with VCStack Pluswriting the information, go to “Activating the VCStack Plus Feature Lic

Página 209 - Chapter 10

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 287Activating the VCStack P

Página 210

Chapter 15: Building a Stack288 Section III: Building a Stack with VCStack PlusNoteIf the chassis has two controller cards, the active controller auto

Página 211

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 289Enabling the Stacking Fe

Página 212 - Management

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 29DCSolid Green The power supply is providing

Página 213 - Commands

Chapter 15: Building a Stack290 Section III: Building a Stack with VCStack Plus3. Enter the EXIT command to return to the Privileged Exec mode.awplus(

Página 214

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 291Displaying the Feature L

Página 215 - Troubleshooting

Chapter 15: Building a Stack292 Section III: Building a Stack with VCStack Plusthe first chassis. If the two chassis have the same licenses and enable

Página 216

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 293Setting the ID NumberThe

Página 217 - AT-SBxPWRSYS1 DC Power Supply

Chapter 15: Building a Stack294 Section III: Building a Stack with VCStack Plusconfiguring the first switch of the stack and want to assign it the num

Página 218 - Chapter 11: Troubleshooting

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 2955. After changing the ID

Página 219 - Ethernet Line Cards

Chapter 15: Building a Stack296 Section III: Building a Stack with VCStack PlusFigure 187. SHOW STACK Command7. Verify the pending ID number change.Ea

Página 220

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 297Setting the Priority Num

Página 221 - Twisted Pair Ports

Chapter 15: Building a Stack298 Section III: Building a Stack with VCStack PlusPowering Off the ChassisNow that you have configured the chassis, you s

Página 222

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 299Configuring the Second C

Página 223 - Power Over Ethernet

3Electrical Safety and Emissions StandardsThis product meets the following standards.EMI/RFI Emissions: FCC Class A, EN55022 Class A, EN61000-3-2, EN6

Página 224

Chapter 1: Chassis and Power Supplies30 Section I: Hardware OverviewAT-SBxPWRPOE1 Power SupplyThe AT-SBxPWRPOE1 Power Supply, shown in Figure 10, prov

Página 225

Chapter 15: Building a Stack300 Section III: Building a Stack with VCStack PlusInstalling and Cabling the Stacking TransceiversFor background informat

Página 226

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 301Figure 190. Installing t

Página 227 - AT-SBxFAN06 Fan Module

Chapter 15: Building a Stack302 Section III: Building a Stack with VCStack PlusFigure 192. Positioning the Handle on the Transceiver6. Connect the fib

Página 228

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 303Powering On the StackThe

Página 229

Chapter 15: Building a Stack304 Section III: Building a Stack with VCStack Plusso that its active master controller card becomes the active card for t

Página 230

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 305Figure 194. Initializati

Página 231 - Replacing Modules

Chapter 15: Building a Stack306 Section III: Building a Stack with VCStack PlusFigure 195. Initialization Messages for the Stack (Continued)Received e

Página 232 - Supplies

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 307Verifying the StackAfter

Página 233

Chapter 15: Building a Stack308 Section III: Building a Stack with VCStack Plus4. Do one of the following: If the SHOW STACK command is displaying al

Página 234 - Chapter 12: Replacing Modules

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 309Installing Optional Feat

Página 235 - Figure 157 on page 236

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 31Table 2. AT-SBxPWRPOE1 Power Supply LEDsLE

Página 236

Chapter 15: Building a Stack310 Section III: Building a Stack with VCStack PlusTroubleshooting the StackThe best way to determine if the switches are

Página 237

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 311enabled the feature on t

Página 238

Chapter 15: Building a Stack312 Section III: Building a Stack with VCStack Plus

Página 239

313Appendix ATechnical SpecificationsPhysical SpecificationsDimensions (W x D x H)Weight (Kilograms)Table 26. Product DimensionsAT-SBx8106 Chassis 4

Página 240

Appendix A: Technical Specifications314AT-SBx81GP24 PoE Line Card 1.06 kg (2.34 lb)AT-SBx81GS24a SFP Line Card 1.06 kg (2.34 lb)AT-SBx81XS6 SFP+ Line

Página 241

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation Guide315Environmental SpecificationsNoteThe acoustic noise was measured at 40° C

Página 242

Appendix A: Technical Specifications316Power SpecificationsAC Voltage, Frequency Requirements (Volts, Hertz)CC Voltage RequirementsTypical power savin

Página 243 - 165 on page 244

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation Guide317Maximum power supply efficiency (based on 100V input voltage)Heat dissip

Página 244

Appendix A: Technical Specifications318PoE ModeSafety and Electromagnetic Emissions CertificationsSafety and Electromagnetic Emissions:IEEE 802.3af Cl

Página 245

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation Guide319Port PinoutsThis section has the pinouts for the ports on the AT-SBx81GT

Página 246 - Figure 168 on page 247

Chapter 1: Chassis and Power Supplies32 Section I: Hardware OverviewAT-SBxPWRSYS1 DC Power SupplyThe AT-SBxPWRSYS1 DC Power Supply, shown in Figure 11

Página 247

Appendix A: Technical Specifications320Table 42 lists the port pin signals when a 10/100/1000Base-T port is operating at 1000 Mbps.Table 42. 1000Bas

Página 248 - Replacing Ethernet Line Cards

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation Guide321Fiber Optic Specifications of the AT-StackOP/0.3 and AT-StackOP/9.0 Tran

Página 249

Appendix A: Technical Specifications322TransmitterWavelength 1310 nmOutput Optical Power -8.2 dBm min.+0.5 dBm max.ReceiverWavelength 1310 nmMaximum S

Página 250

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 33NoteTo avoid installing both AC and DC power

Página 251

Chapter 1: Chassis and Power Supplies34 Section I: Hardware OverviewAT-SBxFAN06 ModuleThe AT-SBxFAN06 Module, shown in Figure 12, is the cooling unit

Página 252

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 35Power Supply Interfaces (Opto-couplers)The c

Página 253 - Fan Module

Chapter 1: Chassis and Power Supplies36 Section I: Hardware OverviewTable 5. Power Supply Interface LEDLED State DescriptionPowerSolid Green The int

Página 254 - Connector

37Chapter 2Ethernet Line CardsThis chapter describes the Ethernet line cards for the SwitchBlade x8106 Chassis Switch in the following sections: “Eth

Página 255

Chapter 2: Ethernet Line Cards38 Section I: Hardware OverviewEthernet Line CardsThe Ethernet line cards are shown in Figure 14.Figure 14. Ethernet Lin

Página 256 - Installing a New

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 39AT-SBx81GT24 Line CardThe AT-SBx81GT24 Line

Página 257

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation Guide4Translated Safety StatementsImportant: The  indicates that a translation

Página 258

Chapter 2: Ethernet Line Cards40 Section I: Hardware OverviewFigure 16. Port LEDs on the AT-SBx81GT24 Line CardTable 6. Port LEDs on the AT-SBx81GT2

Página 259 - Chapter 13

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 41AT-SBx81GT40 Line CardThe AT-SBx81GT40 Line

Página 260 - Before You Begin

Chapter 2: Ethernet Line Cards42 Section I: Hardware OverviewLEDs The LEDs for a port on the AT-SBx81GT40 Line Card are found on the RJ point 5 cable

Página 261

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 43Table 7. Port LEDs on the AT-SBx81GT40 Lin

Página 262

Chapter 2: Ethernet Line Cards44 Section I: Hardware OverviewAT-SBx81GP24 PoE Line CardThe AT-SBx81GP24 PoE Line Card, shown in Figure 20, is a Gigabi

Página 263

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 45LEDs Each port on the AT-SBx81GP24 PoE Line

Página 264

Chapter 2: Ethernet Line Cards46 Section I: Hardware OverviewPoE Off This LED state can result from the following conditions: The port is not connect

Página 265 - Switches

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 47AT-SBx81GS24a SFP Line CardThe AT-SBx81GS24a

Página 266

Chapter 2: Ethernet Line Cards48 Section I: Hardware OverviewFigure 23. Port LEDs on the AT-SBx81GS24a SFP Line CardTable 9. Port LEDs on the AT-SBx

Página 267 - Section III

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 49AT-SBx81XS6 SFP+ Line CardThe AT-SBx81XS6 Li

Página 268

5Preface ...

Página 269 - VCStack Plus Overview

Chapter 2: Ethernet Line Cards50 Section I: Hardware OverviewTable 10. SFP+ Slot LEDs on the AT-SBx81XS6 Line CardLED State DescriptionL/ASolid Gree

Página 270 - Overview

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 51AT-SBx81XS16 SFP+ Line CardThe AT-SBx81XS16

Página 271

Chapter 2: Ethernet Line Cards52 Section I: Hardware OverviewFigure 27. SFP+ Slot LEDS on the AT-SBx81XS16 Line CardTable 11. SFP+ Slot LEDs on the

Página 272

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 5310/100/1000Base-T Twisted Pair PortsThis sec

Página 273 - Card Per Chassis

Chapter 2: Ethernet Line Cards54 Section I: Hardware OverviewCableRequirementsThe cable requirements for the ports on the AT-SBx81GT24 and AT-SBx81GT4

Página 274 - Cards Per

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 55Automatic MDIXDetectionThe 10/100/1000 Mbps

Página 275

Chapter 2: Ethernet Line Cards56 Section I: Hardware OverviewPower over Ethernet on the AT-SBx81GP24 Line CardThis section applies to the AT-SBx81GP24

Página 276 - VCStack Plus Feature License

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 57Power Budgeting The power for PoE on the por

Página 277 - Optional Feature Licenses

Chapter 2: Ethernet Line Cards58 Section I: Hardware Overviewsupport PDs that receive power using Alternative A.PDs that comply with the IEEE 802.3af

Página 278 - Chassis ID Numbers

59Chapter 3AT-SBx81CFC960 Controller Fabric CardThis chapter describes the AT-SBx81CFC960 Controller Fabric Card in the following sections: “Hardware

Página 279 - Priority Numbers

Contents6Power over Ethernet on the AT-SBx81GP24 Line Card... 56Powered

Página 280

Chapter 3: AT-SBx81CFC960 Controller Fabric Card60 Section I: Hardware OverviewHardware ComponentsThe components on the controller card are identified

Página 281 - Stacking Guidelines

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 61Slots for 10Gbps SFP+ TransceiversSupports f

Página 282

Chapter 3: AT-SBx81CFC960 Controller Fabric Card62 Section I: Hardware OverviewGuidelinesHere are a few functions of the controller card: Chassis Man

Página 283 - Building a Stack

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 63controller card. The chassis may have eithe

Página 284

Chapter 3: AT-SBx81CFC960 Controller Fabric Card64 Section I: Hardware OverviewDual Controller CardsYou may install either one or two controller cards

Página 285

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 65One of the controller cards becomes the acti

Página 286 - Chapter 15: Building a Stack

Chapter 3: AT-SBx81CFC960 Controller Fabric Card66 Section I: Hardware OverviewSYS Status LEDsThe SYS (System) Status LEDs on the controller fabric ca

Página 287

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 67FANSolid Green Indicates that the fan module

Página 288

Chapter 3: AT-SBx81CFC960 Controller Fabric Card68 Section I: Hardware Overvieweco-friendly ButtonYou may use the eco-friendly button on the controlle

Página 289 - Enabling the Stacking Feature

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 69SBx Linecard Status LEDsThe SBx Linecard Sta

Página 290

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation Guide7Installing SFP+ Transceivers in the AT-SBx81XS16 Line Card ...

Página 291

Chapter 3: AT-SBx81CFC960 Controller Fabric Card70 Section I: Hardware OverviewSFP+ SlotsThe controller card has four SFP+ slots on the front panel. T

Página 292

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 71Table 19. LEDs for the SFP+ Slots on the AT-

Página 293 - Setting the ID Number

Chapter 3: AT-SBx81CFC960 Controller Fabric Card72 Section I: Hardware OverviewConsole (RS-232) PortThe Console Port is used to conduct local manageme

Página 294

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 73Ethernet Management Port (NET MGMT)The contr

Página 295

Chapter 3: AT-SBx81CFC960 Controller Fabric Card74 Section I: Hardware OverviewTable 20. NET MGMT Port LEDLED State DescriptionL/ASolid Green The po

Página 296

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 75USB PortThe USB port supports a flash drive.

Página 297 - Setting the Priority Number

Chapter 3: AT-SBx81CFC960 Controller Fabric Card76 Section I: Hardware OverviewReset ButtonYou may use the Reset button to reset either the controller

Página 298 - Powering Off the Chassis

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 77NoteTo reset individual line cards in the ch

Página 299

Chapter 3: AT-SBx81CFC960 Controller Fabric Card78 Section I: Hardware OverviewAlliedWare Plus Software Releases for the Hardware ComponentsTable 21 l

Página 300

79Section IIInstalling the ChassisThis section contains the following chapters: Chapter 4, “Safety Precautions and Site Requirements” on page 81 Cha

Página 301

Contents8Cabling Configurations for the Stacking Transceivers ... 273O

Página 303 - Powering On the Stack

81Chapter 4Safety Precautions and Site RequirementsThis chapter contains the safety precautions and guidelines for selecting a site for the chassis. T

Página 304 - Sequence

Chapter 4: Safety Precautions and Site Requirements82 Section II: Installing the ChassisReviewing Safety PrecautionsPlease review the following safety

Página 305

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 83NotePluggable Equipment. The socket ou

Página 306

Chapter 4: Safety Precautions and Site Requirements84 Section II: Installing the ChassisWarningMounting of the equipment in the rack should be such th

Página 307 - Verifying the Stack

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 85WarningReliable earthing of rack-mount

Página 308

Chapter 4: Safety Precautions and Site Requirements86 Section II: Installing the ChassisSelecting a Site for the SwitchBlade x8106Please perform the f

Página 309

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 87Figure 29. 100 - 125 VAC 125 V NEMA 5-

Página 310 - Troubleshooting the Stack

Chapter 4: Safety Precautions and Site Requirements88 Section II: Installing the ChassisInstallation Tools and MaterialHere are the installation tools

Página 311

89Chapter 5Installing the Chassis in an Equipment RackThis chapter describes how to install the AT-SBx8106 Chassis in an equipment rack. This chapter

Página 312

9FiguresFigure 1: AT-SBx8106 Chassis ...

Página 313 - Technical Specifications

Chapter 5: Installing the Chassis in an Equipment Rack90 Section II: Installing the ChassisRequired Tools and MaterialHere is a list of the tools and

Página 314

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 91Preparing the Equipment RackThis secti

Página 315 - Environmental Specifications

Chapter 5: Installing the Chassis in an Equipment Rack92 Section II: Installing the ChassisFigure 30. Reserving Vertical Rack Space190.0 mm (7.5“)152.

Página 316 - Power Specifications

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 933. Identify the lowest 1/2” screw hole

Página 317

Chapter 5: Installing the Chassis in an Equipment Rack94 Section II: Installing the ChassisUnpacking the AT-SBx8106 ChassisTo unpack the AT-SBx8106 Ch

Página 318 - PoE Mode

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 95Figure 33. Components of the AT-SBx810

Página 319 - Port Pinouts

Chapter 5: Installing the Chassis in an Equipment Rack96 Section II: Installing the ChassisRemoving the Rubber FeetThe chassis comes with rubber feet

Página 320

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 97Figure 35. Removing the Rubber Feet3.

Página 321 - Transceivers

Chapter 5: Installing the Chassis in an Equipment Rack98 Section II: Installing the ChassisAdjusting the Equipment Rack BracketsThe chassis has two pr

Página 322

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 99Figure 36. Rack Mounting Bracket Locat

Modelos relacionados SwitchBlade x8106

Comentários a estes Manuais

Sem comentários