Vista de página 0
613-001492 Rev. A
x610 Series
Layer 3 Stackable
Gigabit Ethernet
Switches
x610-24Ts
x610-24Ts/X
x610-48Ts
x610-48Ts/X
x610-24Ts-POE+
x610-24Ts/X-POE+
x610-48Ts-POE+
x610-48Ts/X-POE+
Installation Guide
Vista de página 0
1 2 3 4 5 6 ... 119 120

Resumo do Conteúdo

Página 1 - Installation Guide

613-001492 Rev. Ax610 Series Layer 3 Stackable Gigabit Ethernet Switchesx610-24Ts x610-24Ts/X x610-48Ts x610-48Ts/X x610-24Ts-POE+ x610-24Ts/X-POE+ x

Página 2

Figures10Figure 50. Removing the Dust Plug from an SFP+ Transceiver...

Página 3 - Industry Canada

Chapter 4: Cabling the Network Ports100NoteFor countries that require 100-125 VAC installations, the power cord plug provided with the AT-PWR1200 powe

Página 4 - Translated Safety Statements

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide101Starting a Local Management SessionThe following procedure describes how to connect

Página 5 - Contents

Chapter 4: Cabling the Network Ports102Warranty RegistrationFor warranty information and registration, go to the Allied Telesis web site at www.allied

Página 6

103Chapter 5TroubleshootingThis chapter contains information about how to troubleshoot a switch in the event a problem occurs. Sections in the chapter

Página 7

Chapter 5: Troubleshooting104Power LED is OffCheck the PWR LED on the front of the switch. If the LED is off, indicating that the unit is not receivin

Página 8

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide105Twisted Pair Port Link LED is OffWhen a twisted pair port on the switch is connecte

Página 9 - List of Figures

Chapter 5: Troubleshooting106SFP or SFP+ LED is OffWhen a fiber optic port on the switch is connected to a properly operating end node, the Link LED f

Página 10

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide107Transceiver is Installed but the Status is “Not Present”If a SFP or SFP+ transceive

Página 11 - List of Tables

Chapter 5: Troubleshooting108System Fault LED is BlinkingA blinking FAULT LED indicates that the switch is updating the active boot configuration file

Página 12

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide109System Fault LED is Steadily OnIf the system FAULT LED is steadily on, a problem ha

Página 13

11List of TablesTable 1. Safety Symbols ...

Página 14 - Product Documentation

Chapter 5: Troubleshooting110Cannot Establish a Local (Out-of-Band) Management SessionIf you are unable to establish a local (out-of-band) management

Página 15 - Starting a Management Session

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide111Switch Functions IntermittentlyIf a switch functions intermittently, check the syst

Página 16

Chapter 5: Troubleshooting112Issues with Virtual Stacking Chassis ConfigurationFor information on issues with stacking, refer to the Allied Telesis In

Página 17

113Appendix ATechnical SpecificationsPhysical SpecificationsDimensions (H x W x D):x610-24Ts 44 mm x 440 mm x 419 mm (1.72 in. x 17.34 in. x 16.5 in.)

Página 18 - Contacting Allied Telesis

Appendix A: Technical Specifications114Recommended Minimum Ventilation on Front and Back Sides:100 mm (4.0 in)Environmental SpecificationsOperating

Página 19 - Overview

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide115PoE and PoE+ Output Voltage:DC Output 56V DC, 10-600 mACertificationsEMI (Emission

Página 20 - Introduction

Appendix A: Technical Specifications116RJ-45 Twisted Pair Port PinoutsFigure 61 illustrates the pin layout of an RJ-45 connector and port.Figure 61. R

Página 21 - Switch Descriptions

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide117Table 21 lists the pin signal definitions when a port operating at 1000 Mbps.Table

Página 22 - STACKING

Appendix A: Technical Specifications118RJ-45 Style Serial Terminal Port PinoutsTable 22 lists the pin signal definitions on the RJ-45 style serial ter

Página 23

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide119Table 23 lists the RPS 21-pin D-combo port and connector pinout definitions.Table 2

Página 24

Tables12

Página 25

Appendix A: Technical Specifications120

Página 26 - POE+ Switch

13PrefaceThis guide contains the installation instructions for the x610 Series Layer 3 Gigabit Ethernet Switches. This preface contains the following

Página 27

Preface14Product DocumentationFor overview information about the software features of the AlliedWare Plus Operating System Software which runs on the

Página 28

x610 Layer 3 Series Gigabit Ethernet Switches Installation Guide15Starting a Management SessionFor instructions that describe how to start a local man

Página 29 - 10/100/1000Base-T Ports

Preface16Safety Symbols Used in this DocumentThis document uses the safety symbols defined in Table 1.Table 1. Safety SymbolsSymbol Meaning Descriptio

Página 30 - Auto-MDI/

x610 Layer 3 Series Gigabit Ethernet Switches Installation Guide17Where to Find Web-based GuidesThe installation and user guides for all Allied Telesi

Página 31

Preface18Contacting Allied TelesisThis section provides Allied Telesis contact information for technical support as well as sales and corporate inform

Página 32 - Chapter 1: Overview

19Chapter 1 OverviewThis chapter contains the following sections: “Introduction” on page 20 “Switch Descriptions” on page 21 “10/100/1000Base-T Por

Página 33 - Combo Ports

Copyright © 2011 Allied Telesis, Inc.All rights reserved. No part of this publication may be reproduced without prior written permission from Allied

Página 34

Chapter 1: Overview20IntroductionThe x610 Series Switches are managed Gigabit Ethernet switches that can either act as standalone units or be integrat

Página 35 - SD Card Slot

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide21Switch DescriptionsThe following sections describe the x610 Series Layer 3 Gigabit E

Página 36 - Port LEDs

Chapter 1: Overview22x610-24Ts/XSwitchThe x610-24Ts/X switch has the following hardware features: 24 10/100/1000Base-T ports Four Gigabit Ethernet s

Página 37

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide23x610-48Ts Switch The x610-48Ts switch has the following hardware features: 48 10/10

Página 38 - SFP and SFP+

Chapter 1: Overview24x610-48Ts/XSwitchThe x610-48Ts/X switch has the following hardware features: 48 10/100/1000Base-T ports Two Gigabit Ethernet sm

Página 39

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide25x610-24Ts-POE+SwitchThe x610-24Ts-POE+ switch has the following hardware features:

Página 40

Chapter 1: Overview26x610-24Ts/X-POE+ SwitchThe x610-24Ts/X-POE+ switch has the following hardware features: 24 10/100/1000Base-T ports with Power ov

Página 41 - System STATUS LEDs

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide27x610-48Ts-POE+SwitchThe x610-48Ts-POE+ switch has the following hardware features:

Página 42

Chapter 1: Overview28x610-48Ts/X-POE+ SwitchThe x610-48Ts/X-POE+ switch has the following hardware features: 48 10/100/1000Base-T ports with Power ov

Página 43 - STACK LEDs

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide2910/100/1000Base-T PortsThis section describes the 10/100/1000Base-T ports on the swi

Página 44

3Electrical Safety and Emissions StandardsThis product meets the following standards.RFI Emissions FCC Class A, EN55022 Class A, EN61000-3-2, EN61000-

Página 45 - Secure Digital (SD) LED

Chapter 1: Overview30Cable Type The cabling requirements for a 10/100/1000Base-T port are: For 10 Mbps operation: Standard TIA/EIA 568-B-compliant Ca

Página 46 - Terminal Port

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide31SFP and SFP+ Transceiver SlotsThe x610 Series switches feature slots for optional Gi

Página 47 - Power Supplies

Chapter 1: Overview32NoteFor a list of supported SFP and SFP+ transceivers, contact your Allied Telesis sales representative.

Página 48

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide33Combo PortsOn the 24 port x610 Series switches, the 10/100/1000Base-T ports 21R to 2

Página 49 - Redundant Power Supplies

Chapter 1: Overview34Follow these guidelines when using these ports and slots: Only one port in a pair, either a 10/100/1000Base-T port or a correspo

Página 50

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide35SD Card SlotAll of the x610 Series Switches have an SD card slot for storing configu

Página 51 - AT-LBM (Loop Back) Module

Chapter 1: Overview36Port LEDsThe following sections describe the 10/100/1000Base-T port, SFP, and SFP+ LEDs.10/100/1000 Base-T LEDsOn the non-PoE+ mo

Página 52 - VCStack Stacking Module

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide37Table 6 describes the LEDs for the Base-T ports.Table 6. Switch Base-T LED Descripti

Página 53 - AC Power Connector

Chapter 1: Overview38SFP and SFP+ LEDsFor each SFP slot there is one LINK/ACTIVITY LED, as shown in Figure 14, Figure 15, Figure 16, and Figure 17.Fo

Página 54

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide39 Figure 16. SFP LEDs on x610-48Ts and x610-48Ts-POE+ Switches Figure 17. SFP and SFP

Página 55 - Power Device (PD)

4Translated Safety StatementsImportant: The  indicates that a translation of the safety statement is available in a PDF document “Translated Safety S

Página 56

Chapter 1: Overview40Table 8. SFP Slot LED DescriptionsLED Function State DescriptionL/A Link Status and ActivityOff No link has been established betw

Página 57 - Virtual Chassis Stacking

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide41System STATUS LEDsThe system STATUS LEDs on the front panel display general status i

Página 58 - VCStack Introduction

Chapter 1: Overview42RPS Off No optional redundant power supply is connected to the switch.Solid GreenAn optional redundant power supply is physically

Página 59 - The Physical

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide43STACK LEDsThe STACK LEDs display the link status of the VCStack stacking module and

Página 60 - Ring Configuration

Chapter 1: Overview44L/A 2 Off Stack Port 2 has not established a link to a stacking port on another VCStack stacking module.Solid GreenStack Port 2 h

Página 61 - Configurations

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide45Secure Digital (SD) LEDAll x610 Series Switches have one Secure Digital (SD) LED, sh

Página 62 - Selecting the Stack Master

Chapter 1: Overview46Terminal PortThe terminal port is used to establish a local (out-of-band) management session with the switch. You establish a loc

Página 63 - Stack Management VLAN

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide47Power SuppliesThe x610-24Ts-POE+, x610-24Ts/X-POE+, x610-48Ts-POE+ and x610-48Ts/X-

Página 64 - Stack Member Identification

Chapter 1: Overview48Figure 23. AT-PWR1200 Power Supply2187AT-PWR1200100-240VAC~ 16A MAXDC OUTFAULT

Página 65 - Connecting

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide49Redundant Power SuppliesThe Redundant Power Supply connector on an x610 Series switc

Página 67 - Steps to set up a

Chapter 1: Overview50The RPS can be the only source of PoE power for the switch or the RPS can boost the PoE power available from the primary power so

Página 68

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide51AT-LBM (Loop Back) ModuleThe x610-48Ts/X and x610-48Ts/X-POE+ switches are shipped f

Página 69 - Steps to replace a

Chapter 1: Overview52VCStack Stacking ModuleA Virtual Chassis Stack (VCStack) is two or more separate Allied Telesis switches that are configured to o

Página 70

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide53AC Power ConnectorThe x610 switches have a single AC power supply socket on the rear

Página 71 - Installing the Hardware

Chapter 1: Overview54Power Over Ethernet Plus (PoE+)The following section applies to x610-24Ts-POE+, x610-24Ts/X-POE+, x610-48Ts-POE+ and x610-48Ts/X-

Página 72 - Reviewing Safety Precautions

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide55* The Maximum Power Level Output levels reflect the loss introduced by a 100 meter E

Página 73

Chapter 1: Overview56Table 14. PoE+ Ports Supported With AT-PWR800 Power Supply UnitModelAvailable PoE PowerIEEE 802.3at Class 4 (30W)IEEE 802.3af Cla

Página 74

57Chapter 2 Virtual Chassis StackingThis chapter contains the following sections: “VCStack Introduction” on page 58 “Features of VCStacking” on page

Página 75 - Unpacking a Switch

Chapter 2: Virtual Chassis Stacking58VCStack IntroductionVirtual Chassis Stacking (VCStack™) is the name given to two or more separate Allied Telesis

Página 76 - 100-240VAC

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide59The Physical StackDepending on the switch types used, a stack can comprise from 2 to

Página 77

Contents6AC Power Connector ...

Página 78

Chapter 2: Virtual Chassis Stacking60Ring ConfigurationA virtual stack using x610 switches can comprise up to 8 stack members connected in a ring topo

Página 79 - AT-x6EM/XS2

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide61Resiliency Link Configurations via Switch PortsTwo resiliency-link configurations th

Página 80 - Stacking Module

Chapter 2: Virtual Chassis Stacking62Stack FormationA VCStack always contains a master plus a number of stack members. To be part of a stack, a switch

Página 81 - STAC KI NG

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide63NoteNew switches are shipped with a Stack Member-ID of 1 and a priority of 128. If f

Página 82

Chapter 2: Virtual Chassis Stacking64Stack Member IdentificationWhen a switch becomes a member of a VCStack it is assigned a Stack Member-ID. Stack st

Página 83

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide65Connecting switches into a stackThe proprietary high-speed communication protocol th

Página 84 - AT-StackXG

Chapter 2: Virtual Chassis Stacking66the AT-StackXG stacking module: High Speed Stacking Cables (0.5 meter) - StackXG/0.5 High Speed Stacking Cables

Página 85

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide67Steps to set up a VCStackThere are no set rules regarding the order in which stack c

Página 86

Chapter 2: Virtual Chassis Stacking68members should be green. Port LEDs that are off or flashing amber indicate that the stack is not operating correc

Página 87

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide69Steps to replace a stack memberIf you need to replace a stack member, use the follow

Página 88

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide7RJ-45 Twisted Pair Port Pinouts...

Página 89 - Cabling the Network Ports

Chapter 2: Virtual Chassis Stacking70switches in a stack. This is possible even if mixed-mode stacking is disabled on x610 Series switches. For more i

Página 90 - Specifications

71Chapter 3Installing the HardwareThis chapter provides procedures to install a x610 switch. The chapter contains the following sections: “Reviewing

Página 91 - Transceiver

Chapter 3: Installing the Hardware72Reviewing Safety PrecautionsPlease review the following safety precautions before you begin to install the switche

Página 92 - LASER PRODUC

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide73All Countries: Install product in accordance with local and National Electrical Code

Página 93

Chapter 3: Installing the Hardware74Warning: To reduce the risk of electric shock, the PoE ports on this product must not connect to cabling that is r

Página 94

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide75Unpacking a SwitchTo unpack a switch, perform the following procedure:1. Remove all

Página 95

Chapter 3: Installing the Hardware76Installing the Power Cord Retaining Clip This section applies to the fixed power supplies installed in the x610-24

Página 96 - (0.31in. ±0.039in.)

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide77Installing the Switches in an Equipment RackPerform the following procedure to insta

Página 97 - AT-PWR250

Chapter 3: Installing the Hardware78Figure 37. Attaching Rack-Mount Brackets5. Mount the switch in a 19-inch rack using standard screws (not provided)

Página 98

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide79VCStack Stacking Module InstallationOverview When you are preparing the x610 switche

Página 99

Contents8

Página 100

Chapter 3: Installing the Hardware80AT-StackXG must be installed.Preparation Review the following information before installing a VCStack stacking mod

Página 101 - Management

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide81Figure 41. Removing the Blank Panel from the Expansion SlotNoteAll x610 Series Layer

Página 102 - Warranty Registration

Chapter 3: Installing the Hardware82Figure 42. Installing the AT-StackXG Stacking ModuleFigure 43. Installing the AT-x6EM/XS2 Stacking Module4. Secure

Página 103 - Troubleshooting

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide83Figure 44. Securing the AT-StackXG Stacking ModuleFigure 45. Securing the AT-x6EM/XS

Página 104 - Power LED is Off

Chapter 3: Installing the Hardware84Cabling an AT-StackXG Stacking Module1. Remove the plastic protector from the connector at one end of the stacking

Página 105

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide85Cabling an AT-x6EM/XS2 Stacking Module1. Remove the dust plug from a transceiver slo

Página 106 - SFP or SFP+ LED is Off

Chapter 3: Installing the Hardware865. Verify that the handle on the SFP+ transceiver is in the upright position, as shown in Figure 49, to prevent in

Página 107

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide87Figure 51. Connecting a Fiber Optic Cable to the SFP+ Transceiver8. Connect the othe

Página 108 - System Fault LED is Blinking

Chapter 3: Installing the Hardware88

Página 109

89Chapter 4Cabling the Network PortsThis chapter contains the instructions for attaching network cables to an x610 switch. The chapter contains the fo

Página 110 - Chapter 5: Troubleshooting

9List of FiguresFigure 1. x610-24Ts Switch...

Página 111

Chapter 4: Cabling the Network Ports90Twisted Pair and Fiber Optic SpecificationsTwisted Pair Cable SpecificationsTable 17 lists the cabling specifica

Página 112

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide91SFP and SFP+Transceiver SpecificationsThe specifications for optional SFP and SFP+ t

Página 113 - Technical Specifications

Chapter 4: Cabling the Network Ports92Installing SFP and SFP+ TransceiversReview the following guidelines before installing an optional SFP or SFP+ tr

Página 114 - Power Specifications

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide932. Remove the transceiver from its shipping container and store the packaging materi

Página 115 - Certifications

Chapter 4: Cabling the Network Ports94Cabling the 10/100/1000Base-T and Fiber Optic PortsObserve the following guidelines when connecting a twisted pa

Página 116

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide95Powering on a Switch with a DC AT-PWR250 Power Supply ModuleTo power on a switch wit

Página 117

Chapter 4: Cabling the Network Ports96Figure 54. DC Terminal Block on the DC AT-PWR250 Power Supply Module4. With a 14-gauge wire-stripping tool, stri

Página 118

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide97WarningWhen installing this equipment, always ensure that the power supply ground co

Página 119

Chapter 4: Cabling the Network Ports9810. Connect the supply-cable wires to the circuit breaker.11. Energize the circuit breaker.12. Turn the power su

Página 120

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide99Powering on a Switch with an AC Power Supply ModuleTo power on a switch with an AC P