Allied-telesis x510 Series Manual do Utilizador Página 66

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 65
Chapter 4: Cabling the Networking Ports
66
Installing SFP
and SFP+
Modules
To install SFP and SFP+ transceivers in slots 27 and 28 of the 28-port
switches and slots 51 and 52 of the 52-port switches, perform the following
procedure:
1. Remove the dust plug from a transceiver slot on the switch. Refer to
Figure 24 on page 66.
Figure 24. Removing the Dust Plug from an SFP+ Slot
2. Remove the transceiver from its shipping container and store the
packaging material in a safe location.
3. If you are installing the transceiver in a top slot, position the
transceiver with the Allied Telesis label facing up. If you are installing
the transceiver in a bottom slot, position the transceiver with the label
facing down.
4. Slide the transceiver into the slot until it clicks into place, as shown in
Figure 25 on page 67.
Vista de página 65
1 2 ... 61 62 63 64 65 66 67 68 69 70 71 ... 89 90

Comentários a estes Manuais

Sem comentários