Allied Telesis Switch AT-SBXPWRSYS1 Manual do Utilizador Página 148

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 147
Chapter 6: Installing the Transceivers and Cabling the Ports
148
3. Orient the transceiver with the handle on top, as shown in Figure 104.
Figure 104. Handle on the XFP Transceiver
4. Slide it into the slot until it clicks into place, as shown in Figure 105.
Figure 105. Installing an XFP Transceiver in the AT-SBx31XZ4 Line Card
Note
If you are ready to attach the fiber optic cable to the transceiver,
continue with the next step. Otherwise, repeat steps 1 to 4 to install
the remaining XFP transceivers.
Handle
Vista de página 147
1 2 ... 143 144 145 146 147 148 149 150 151 152 153 ... 221 222

Comentários a estes Manuais

Sem comentários