Allied Telesis Switch AT-SBXPWRSYS1 Manual do Utilizador Página 173

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 172
SwitchBlade x3112 Installation Guide
173
Figure 130. Tightening the Handle Locking Screw
8. Before attaching the power wires from the power supply to the circuit
breaker in the wiring closet, check that the circuit breaker is off.
9. Connect the power wires to the circuit breaker.
10. Turn the circuit breaker on.
11. Turn the On/Off switch on the power supply to the On position. See
Figure 131 on page 174.
Handle locking
screw
Vista de página 172
1 2 ... 168 169 170 171 172 173 174 175 176 177 178 ... 221 222

Comentários a estes Manuais

Sem comentários