Allied Telesis Switch AT-SBXPWRSYS1 Manual do Utilizador Página 165

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 164
SwitchBlade x3112 Installation Guide
165
Figure 119. Installing the Grounding Wire
5. Connect the other end of the grounding wire to the building protective
earth.
When installing this equipment, always ensure that the power supply
ground connection is installed first and disconnected last. E11
This system will work with a positive grounded or negative grounded
DC system. E13
Grounding
wire
Vista de página 164
1 2 ... 160 161 162 163 164 165 166 167 168 169 170 ... 221 222

Comentários a estes Manuais

Sem comentários