Allied-telesis SwitchBlade x8106 Manual do Utilizador Página 106

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 105
Chapter 4: Installing the Power Supplies
106
Figure 61. Loosening the Handle locking Screw on the AT-SBxPWRPOE1
DC Power Supply
5. Raise the locking handle on the AT-SBxPWRPOE1 DC Power Supply,
as shown Figure 62.
Figure 62. Raising the Handle on the AT-SBxPWRPOE1 DC Power
Supply
6. Align and insert the AT-SBxPWRSYS1 Module into slot C or D. Figure
63 on page 107 shows the power supply installed in slot D.
Caution
The AT-SBxPWRSYS1 DC Power Supply will not work in slot A or
B.
Vista de página 105
1 2 ... 101 102 103 104 105 106 107 108 109 110 111 ... 239 240

Comentários a estes Manuais

Sem comentários