Allied-telesis SwitchBlade x8106 Manual do Utilizador Página 147

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 146
SwitchBlade x8106 Chassis Switch Installation Guide
147
Figure 99. Securing the Power Cord for the AT-SBxPWRSYS1 AC Power
Supply to an Anchor
4. Connect the power cord to an appropriate AC power source to power
on the power supply.
5. If the chassis has two AT-SBxPWRSYS1 AC System Power Supplies,
repeat this procedure to power on the second power supply.
After powering on the AT-SBxPWRSYS1 AC System Power Supplies, do
one of the follow:
If the chassis has AT-SBxPWRPOE1 PoE Power Supplies,
perform the procedure in “Powering On the AT-SBxPWRPOE1
Power Supply” on page 148.
Otherwise, go to “Monitoring the Initialization Process” on
page 177.
Anchor
Vista de página 146
1 2 ... 142 143 144 145 146 147 148 149 150 151 152 ... 239 240

Comentários a estes Manuais

Sem comentários