Allied-telesis SwitchBlade x8106 Manual do Utilizador Página 133

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 132
SwitchBlade x8106 Chassis Switch Installation Guide
133
7. Connect the fiber optic cable to the port on the transceiver, as shown
in Figure 87. The connector should snap into the port.
Figure 87. Attaching a Fiber Optic Cable to an SFP Transceiver in the AT-
SBx81GS24a Line Card
8. Repeat this procedure to install additional SFP transceivers.
After installing and cabling the SFP transceivers, do one of the following:
To install and cable additional transceivers, go to the appropriate
section in this chapter for instructions.
After cabling all the ports in the chassis, go to Chapter 7,
“Powering On the Chassis” on page 143.
Vista de página 132
1 2 ... 128 129 130 131 132 133 134 135 136 137 138 ... 239 240

Comentários a estes Manuais

Sem comentários