SwitchBlade x8112 Chassis Switch Installation Guide
135
5. Connect the fiber optic cable to the port on the transceiver, as shown
in Figure 89. The connector should snap into the port.
Figure 89. Attaching a Fiber Optic Cable to an SFP+ Transceiver in the
AT-SBx81XS6 Line Card
6. Repeat this procedure to install additional SFP plus transceivers in the
AT-SBx81XS6 Line Cards.
After installing and cabling the SFP+ transceivers, do one of the following:
To install and cable additional transceivers, go to the appropriate
section in this chapter for instructions.
After cabling all the ports in the chassis, go to Chapter 7,
“Powering On the Chassis” on page 141.