Allied-telesis SwitchBlade x8112 Manual do Utilizador Página 72

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 71
Chapter 3: Installing the Chassis in an Equipment Rack
72
Required Tools and Material
Here is a list of the tools and material you need to perform the installation:
#2 Phillips-head screwdriver
Crimping tool
Eight equipment rack screws
10 AWG stranded grounding wire
#2 Phillips-head, 5 inch-lbs torque screwdriver (optional)
#2 Phillips-head, 10 inch-lbs torque screwdriver (optional)
#2 Phillips-head, 20 inch-lbs torque screwdriver (optional)
Warning
The chassis may be heavy and awkward to lift. Allied Telesis
recommends that you get assistance when mounting the chassis in
an equipment rack. E30
Vista de página 71
1 2 ... 67 68 69 70 71 72 73 74 75 76 77 ... 239 240

Comentários a estes Manuais

Sem comentários