Allied Telesis AT-iMG606BD Especificações Página 293

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 995
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 292
9. Controlling and Provisioning Network Devices Customer Cutover
284
AlliedView NMS Administration Guide
In this example, six iMGs are being transferred from FX10 ports to FX20 ports. Also, the source and target ports are on the
same device, but the target ports could be on a different device.
Caution: If performing cut-over to a different device, the VLAN network must be pre-configured to maintain IP connectivity after the
cables are moved over to the new ports. (Refer to Section 7 on how Access Islands are configured to guarantee this.)
Otherwise, customer cut-over to the new port will not complete automatically.
Vista de página 292
1 2 ... 288 289 290 291 292 293 294 295 296 297 298 ... 994 995

Comentários a estes Manuais

Sem comentários